Global project inquiries · Hefei, China
ZonyeaBRINGING QUALITY CHINESE FURNITURE TO THE WORLD
Hotel Furniture Projects by Zonyea
Apartment & Hotel Furniture

Hotel furniture packages for guest rooms and public areas.

Hotel furniture manufacturer and project supplier for guest rooms, lobbies, restaurants, lounges and coordinated international hospitality packages.

Request a project quotation
Product & industry expertise

Hotel Furniture Projects for international B2B projects.

Zonyea supports wholesalers, contractors, designers and institutional buyers with product selection, specification review, manufacturing coordination and delivery planning.

Every project is reviewed against destination, drawings, quantities, materials, finishes, required standards and target delivery date before a commercial proposal is confirmed.

29,000 m²Integrated manufacturing base
3,092Enterprise and institutional clients
13 countriesProducts supplied internationally
B2BWholesale and project orders
Applications

Guest rooms, lounge and dining: six furnishing directions.

These catalogue images illustrate furnishing directions, not completed client projects. Product dimensions, finishes and availability are confirmed against your room schedule.

Choose the project route

Hotel furniture procurement for new builds and renovations.

The drawings and delivery plan needed for a new hotel differ from those for a property replacing furniture while parts of the site remain in use. State the route early so the quotation reflects the actual scope.

New-build hotels

Start with the approved room-type schedule, typical-room and suite drawings, public-area plans and a furniture bill of quantities. Identify repeated items, room variations and target handover dates before comparing a package price.

Hotel renovations

Mark furniture to retain, replace or add. Share verified site dimensions, door and lift access, any occupied-floor restrictions and the release sequence for each area. Removal and installation responsibilities should be agreed separately in the scope.

Define package boundaries

Separate guest-room furniture from lobby, dining and meeting furniture; list any fixtures or equipment outside the furniture quotation. For each area, confirm who approves drawings, finishes and samples before production decisions.

FF&E buyer checklist

Turn the design schedule into a decision-ready furniture enquiry.

FF&E includes more than furniture. Send the furniture line items and identify exclusions; the final product scope, specifications and availability are confirmed through technical review.

Room-type and quantity matrix

For each standard room, twin room or suite, list the item, drawing reference, dimensions, quantity per room and total room count. Add a separate schedule for reception, lounges, restaurants and meeting areas.

Finish and approval matrix

Match each item to material, upholstery and finish references. Flag required standards for the destination and name the person who will approve drawings or physical samples. Do not assume a finish or compliance claim from a catalogue image.

Packing and phased delivery

Provide destination, receiving address, target dates, room or floor labels, access constraints and the preferred shipment split. Packing method, batch quantities and lead time can then be reviewed against the approved schedule.

Have only an early concept? Send the available plans and an estimated room count; we can identify the missing decisions before preparing a comparable quotation.

Buyer questions

Hotel furniture procurement FAQs.

What should a new-build hotel send for a furniture quotation?

Send the room-type schedule, drawings, furniture bill of quantities, finish references, public-area scope, destination and target handover dates. Mark items that still need design approval so assumptions are visible in the review.

How is a renovation enquiry different?

Identify which items stay and which are replaced, verify existing dimensions and access, and show the intended floor-by-floor release schedule. Removal and installation should be specified separately if required.

Can guest rooms and public areas be reviewed together?

Yes. Bedroom, dining, lobby and lounge furniture can be reviewed as related packages, with separate quantities and finish references for each area. The quotation will confirm what is included and excluded.

Can delivery be planned by floor or project phase?

Share quantities by room or floor, receiving location, access limits and requested delivery windows. Packing labels, shipment split and dates are reviewed and confirmed with the approved scope rather than assumed from an initial enquiry.

Lounge chairs and small tables arranged in a shared interior
Start a quotation

Send drawings, quantities and destination.

Our project team will review the product direction, dimensions, finishes, standards and delivery requirements with you.

Discuss your project